Find out how we leverage our unparalleled residential dealer network and worldclass commercial support services to lead the industry. Parts manufactured or specialty parts 800 9321701 contact airside 800 5457814. External web sites operate at the direction of their respective owners who should be contacted directly with questions regarding the content of these sites. This manual was written for project managers and consulting engineers working for the new york city department of design and construction ddc. York ylua series operation manual pdf download manualslib. Check ratings given in instructions and on the product to ensure the product is suitable for your application.
Ylua installation, operation, maintenance manual form 150. Wire the chiller according to the appropriate chiller wiring diagram. Ylua style a aircooled scroll compressor condensing units. Description of the proposed installation of the backflow preventer indicate the location of backflow preventer, drainage, lighting, heating, access to unit, square footage of the floor level where the backflow preventer is to be located.
York cond unit piping guidelines free download as pdf file. This efficient chiller reduces your energy usage and your environmental footprint. York ylua aircooled scroll condensing unit user guide. For use on ylaa, ylpa, ylua, ycwl and ycrl product. Incomplete installation may cause water leakage, electrical shock, fire or equipment damage.
Installation and startup instructions york solution air handling units supersedes 102. Unit suddnely stop working and showing in remote errow 12sc, 9sc and 3 sc kindly suggest the reason. Improper installation may cause water leakage, electrical shock, fire, or equipment damage. Get tips on the best materials to use to set up a curbside mailbox and how to keep it in good condition. The 78 ton to 160 ton 273 kw to 560 kw ylua condensing unit models are shipped complete from the factory ready for field installation. Each unit includes hermetic scroll compres sors, an air cooled condenser, and a weather resistant microprocessor control center, all mounted on a formed steel base. Install the air conditioner according to the instructions given in this manual. Installation, operation, maintenance aircooled liquid chillers hermetic scroll replaces 150. Guidelines for designing backflow prevention assembly. Failure to follow them could damage the product or cause a hazardous condition. Us air conditioning distributors southern california engineering.
Ycul, ylua split systems installation guide checklist 50. Remove the locktag from the chiller and apply power to the chiller. They are designed for outdoor roof or ground level installation. The unit is pressuretested, evacuated and given a nitrogen holding charge and includes an initial oil charge r410a refrigerant supplied by others. Click on the links below or you can even do a search. As a part of the high performance design initiative, it is meant to enable the introduction of geothermal heat pump technology into projects managed by the ddc. Postal service guidelines for installing and placing a new mailbox at your home. Install the new brackets and the new support for the ycal models 4. We have 1 york ylua series manual available for free pdf download. With hermetic scroll compressors that offer fewer moving parts and a weatherresistant control center, this condensing unit has the highest efficiency for its capacity. Place the unit switch in the control panel to the on position.
Be sure to use the supplied or exact specified installation parts. As each compressor cycles on, ensure that the discharge pressure rises and the suction pressure decreases. The 78160 ton 273 560 kw ylua condensing unit models are shipped complete from the factory ready for. The state of new york does not imply approval of the listed destinations, warrant the accuracy of any information set out in those destinations, or endorse any opinions expressed therein. Find the user manual and the help you need for the products you own at manualsonline. The customer must install and wire a field mounted flow switch. Choose from york, luxaire, coleman, fraserjohnston, guardian, or johnson controls parts. Piles are the starting point for the structure construction and provide the support. Each unit includes hermetic scroll compressors, air cooled condensers, and a weather resistant. Global product family, broad selection, easy installation. A condensing unit can have a significant impact on the productivity, reliability, and energy efficiency of your building. York cond unit piping guidelines heating, ventilating, and air.
General the 15 80 ton 50 280 kw ycul models are shipped complete from the factory ready for installation and use. Well youve come to the right place because this category contains owners manuals and exploded views of parts diagrams. York maxe yk operating and maintenance operating and maintenance 36 pages. Ylaayculycalycwlyluaylpaycrl flash card used in the 031. Operation manual york ylua series operation manual 52 pages. Accessible information includes system startup, installation information, operating documents, warranty information, wiring diagrams and promotional warranty registration. York ylaa operation manual pdf download manualslib. Minimize installation cost, maximize usable space, lower electric bills and reduce service expenses with the york ylaa aircooled scroll chiller.
York cond unit piping guidelines heating, ventilating, and. The following work must be completed in accordance with installation instructions. Chiller york ylua series operation manual 52 pages. Pile driving inspection manual new york state department of. At york, comfort is more than a feeling its a promise. The 78160 ton 273 560 kw ylua condensing unit models are shipped complete from the factory ready for field installation.
Installer must be a trained, experienced service technician. Sep 05, 2019 limit switch alarms, 14, 15 the control monitors the limit switch status for each of the heating sections installed. Model ylua aircooled scroll compressor condensing units style. Installing technician must verify board number in unit prior to installation. Therefore, piles that are installed properly are a good, sound start for making a strong and stable structure. York ymc2 installation and assembly manual installation and assembly manual 74 pages york ycal0019 installation, operation and maintenance manual installation, operation and maintenance manual 230 pages york ycal series manual manual 104 pages york ylua series operation manual operation manual 52 pages york yz engineering manual.
Service information 211 scroll compressor heater installation file inwith. Jci york condensing unit installation and piping guide. Follow the instructions in the acs255 manual and the following pages to power and. York ylua aircooled scroll condensing unit guide york ycul0 specifications reznor masa installation manual ycul muhendislik k.
Service information scroll compressor heater installation. The york ylua aircooled scroll condensing unit offers the same highly efficient, reliable performance as our ycul aircooled condensing unit, but with a higher capacity range. Manual description form number unit replacement parts guide 150. Description of the fire fighting system indicate the a. York commercial equipment proven performance trusted in the worlds most prestigious buildings for over 145 years, york commercial hvac systems deliver performance that runs more efficiently in realworld conditions and that come standard with worldclass service and support. Ycul, ylua split systems installation guide checklist. This kit comes with a single flash card 03102755004 pn. Ycal, ycul, ylaa, ylua, ycwl and ycrl new si0238 product technical support work on this equipment should only be done by properly trained personnel who are qualified to work on this. Model ycul style e aircooled scroll compressor condensing. No matter the scale of your location, we can provide a unit that is highly efficient, sustainable, and serviceable. York ycul aircooled scroll condensing units are a perfect match for central air handling applications. Before starting the replacement, copy down the setpoints and configuration settings from the original pcb.
Please note that pricing on exploded view of parts evps is subject to change. York ylua 80 160 tons condensing unit, scroll compressors, hfc410a refrigerant york vdc 175 2,280 mbh aircooled condenser, multiple refrigerants york vdcf 65 productive, intelligent building environments 2,890 mbh fluid cooler, water or glycol outdoor packaged equipment series 5 singlepackaged units cooling capacity. Ylua aircooled scroll condensing units installation and startup. If the limit switch circuit opens the control deenergizes the heat section output for the section with the open limit circuit and energizes the indoor blower output. Keith industrial group new and used air cooled chillers. Oct 31, 2017 for outdoor roof or ground level installation. Installation and service manuals for heating heat pump. Systems, services and solutions that make buildings work. Get rooftop unitspecific information by simply scanning a qr code on the unit or by entering a serial number. York ylua series operation manual operation manual 52 pages. Model ylua aircooled scroll compressor condensing units style a.
1085 1230 807 805 470 165 1313 1011 1045 1456 1079 771 422 1627 806 1260 742 1656 376 1632 1006 1479 697